Skip to main content
Home

Main navigation

  • Gateway
  • BCATS
    • Level 1 BCATS - 2024
    • Level 2 BCATS - 2024
    • Level 3 BCATS
  • About
    • Consent to Assess
    • Site Notes and Changes
  • Micro Credential Resources
  1. Home
  2. Construct a basic retaining wall as a BCATS project

Construct a basic retaining wall as a BCATS project

Level 2 BCATS - 2024
Unit
12939
  • calculate quantities and prepare an order for materials for basic garden edge retaining walls
  • construct basic garden edge retaining walls
  • complete work operations

 

Download Resources
12939 - Retaining wall - Student resource1.49 MB
12939 - Retaining wall - Teacher resource268.21 KB
12939 - Retaining wall - Assessor Observation Sheet44 KB
12939 - Retaining wall - Assessment Schedule123.36 KB

Select Unit

  • Level 2 - Generic resources
  • Accreditation for NZC BCATS (L2)
  • 12927 - Hand tools
  • 12932 - Furniture
  • 12933 - L2 Concrete
  • 12935 - Deck
  • 12936 - Non-consent building
  • 12938 - Paving
  • 12939 - Retaining Wall
  • 22607 - Plans and specs
  • 24350 - Power tools
  • 24351 - Machinery
  • 24353 - Sketch & draw
  • 24354 - L2 Safety
  • 24357 - Communication
  • 24358 - Plan and monitor
  • 24360 - DKO timber and other materials
  • 24361 - Maths
  • 25921 - Cupboard
  • 31511 - DKO BCATS industries
  • 31812 - L2 project
  • 31860 - Fence
myBCITO

Join myBCITO, a digital toolkit designed for BCATS secondary school teachers and their students studying BCATS or wanting to step into an apprenticeship in building and construction. To find out more and register visit the BCITO website.

BCITO